Composite repair starts with the cause, not a patch.
Leaks or cracks can have different causes: pressure surges, chemical attack or a defective joint. We first assess the system and cause, then the options for repair or replacement.
01 / WHAT MATTERS
What we need to know before recommending a solution.
Repair advice without the fluid, loads and pipe identification would be guesswork. That is not how we work.
02 / DECISION FACTORS
Three steps before planning a repair.
01 / SAFETY
Make the situation safe
Follow the operating site’s safety rules first. Take photographs only from a safe location.
02 / IDENTIFICATION
Identify the system and defect
Pipe markings, photographs, fluid, damage location and time in service.
03 / PROCEDURE
Assess the intervention options
We assess whether to repair or replace the component and whether further inspection is needed. The procedure must match the system and site safety requirements.
03 / BEFORE CONSULTATION
What to send so we can advise effectively.
Photographs, pipe markings, fluid, operating conditions and damage location. If markings are missing, provide at least the diameter and known information.
Send photographs of the damage, pipe identification and fluid. First the cause, then the procedure.
INCLUDE A DESCRIPTION OF THE DEFECT AND AVAILABLE SYSTEM INFORMATION.